The business park was developed on the 20-acre site of the former Macardle Moore brewery, exploiting the many assets that this post-industrial location possesses providing for 55 units. The design and build were dictated and challenged by engineering (Geo-Technical, Civil & Structural) and site constraints. We provided a Full Design Service including all Project Management, Civil & Structural Engineering, M&E, Fire Safety, Cost Control services & Health & Safety.
We designed and implemented a reinforced concrete pile/ground beam foundation arrangement with suspended concrete ground floor slabs, a steel portal frame shell with masonry wall infill panels which catered for all lateral imposed wind loads and additional internal crane loadings applied.
We were tasked with assessing the compliance of the existing brewery with updated building regulations, and design of refurbishment works as required including submission of Fire Safety Cert applications.
We were appointed to undertake the role of Project Supervisor for the Design Process (PSDP) inclusive of all statutory duties/services in compliance with Health and Safety Legislation.
We were appointed to design all the necessary civil infrastructural works, which included roads, drainage & utilities all within challenging site constraints and poor ground conditions.